The label remover machine is used to pre-treatment of the bottle (include PET bottle, PE bottle, HDPE bottle) before washing or crushing. The label on the bottle can be removed up to 99.5%.
The label remover machine adopt imported sharp hard alloy knife teeth to ensure long-time wear-resistance. Claw-shaped knife is welded by copper, while large welding area guarantees firmness, and knife teeth is stable. Knife can be changed and replaced.
Label remover machine complete change the previous way of removing the label by manual work, which greatly improving the productivity and reducing the labor intensity.
The label remover machine is one of the essential washing equipment in the waste plastic washing line, which can be used together with the whole plastic recycling line or can be used alone.
| Capacity(kg/h) | 500-5000 |
| Applicable | HDPE or PET bottles |
| Label removing effective(%) | 97-99.5 |
| Dimension(mm) | 5300x1200x2500 |
| Barrel wall thickness(mm) | 10 |
A Jiangsu Yongzhi Recycling Science &. Technology Co.,Ltd covers anarea of 60000 sauare meters, with one machinery workshop and one product workshop. i's a modernized manufacturingenterprise with machinery, product and technology togethe
A Yongzhi provides washing, recycling and granulation of various types of waste materials. Including: PET bottle recycling line, PE PP film/woven bag recycling line, HDPE bottle washing line, PE PP film pelletizing line, PET granulator, PP woven bag granulation line, HDPE hard material pelletizing machine, and also provides auxiliary equipment such as crusher, shredder, and squeezer.
A Our warranty year is one year. During the period, we provide you spare parts free of charge asap. But the technical guide is forever.
A After the plastic recycling machine is produced, we will debug the production line, take photos and videos and send them to the customer via email or instant tool. Then use standard export packaging to pack the equipment and send it to the customer's workshop.
A We can arrange our engineers to go to the customer's factory for installation. After the equipment is installed, the engineer will run the machine for at least 12 hours to ensure stable operation in the customer's factory.