Float washing tank is used for washing the material and separated floating material and sink material by water. With special design, can separate the impurities and wash the various material.
This float washing tank will take advantage of the weight difference between the flakes and the dirties & the impurities and thus different gravity. It will float those impurities and dissolve those dirties with water. The flakes will sink down to the bottom of the tank, and transported into the next screw feeder with rotating bottom worm leaves.
The float washing tank is one of the essential washing equipment in the waste plastic washing line, which can be used together with the whole plastic recycling line or can be used alone.
| Capacity(kg/h) | Length(mm) | Weight(kg) |
|---|---|---|
| 300 | 6000-9000 | 3500 |
| 500 | 6000-9000 | 4500 |
| 1000 | 6000-9000 | 5500 |
A Jiangsu Yongzhi Recycling Science &. Technology Co.,Ltd covers anarea of 60000 sauare meters, with one machinery workshop and one product workshop. i's a modernized manufacturingenterprise with machinery, product and technology togethe
A Yongzhi provides washing, recycling and granulation of various types of waste materials. Including: PET bottle recycling line, PE PP film/woven bag recycling line, HDPE bottle washing line, PE PP film pelletizing line, PET granulator, PP woven bag granulation line, HDPE hard material pelletizing machine, and also provides auxiliary equipment such as crusher, shredder, and squeezer.
A Our warranty year is one year. During the period, we provide you spare parts free of charge asap. But the technical guide is forever.
A After the plastic recycling machine is produced, we will debug the production line, take photos and videos and send them to the customer via email or instant tool. Then use standard export packaging to pack the equipment and send it to the customer's workshop.
A We can arrange our engineers to go to the customer's factory for installation. After the equipment is installed, the engineer will run the machine for at least 12 hours to ensure stable operation in the customer's factory.